Crusher run / dense grade
7.4 cubic yards
Approx. 11.41 US tonsAggregates & landscaping
Plan separate base and surface layers, then account for volume lost during compaction and ordinary ordering overage.
Your driveway estimate
11.1cubic yards
The base and surface quantities below are ordered separately. Total includes 15% compaction loss and 5% overage.
7.4 cubic yards
Approx. 11.41 US tons3.7 cubic yards
Approx. 5.4 US tonsTake this to your supplier
Layer-by-layer math
length × width × finished layer depth for each layer.
compacted volume ÷ (1 − compaction loss).
Add the selected overage, then round each material up to 0.1 yd³ or m³.
A 15% compaction loss means one loose unit becomes about 0.85 compacted units. This is different from simply adding 15%; the calculator divides by 0.85 before applying waste.
Before ordering
Enter the finished compacted depth of the base and surface separately. Use zero for the base when estimating a surface-only refresh. If width or depth changes along the driveway, split it into sections and add the shopping quantities.
Required depth depends on subgrade, drainage, climate, vehicle loads, aggregate grading, and local practice. Confirm the section design with a qualified local supplier or professional before construction.