Decks & carpentry

Fence material calculator

Estimate fence bays, posts, rails, pickets, and a concrete-bag allowance after accounting for gates, spacing, and waste.

Fence layout

Estimate fence materials

Measurement system
Planning multiplier only: no bag size, hole dimensions, or product yield is inferred.

For a volume-based bag count, use the Post Hole Concrete Calculator.

Overage

Covers spillage, uneven depth, settling, and minor measurement differences.

Optional material costEnter your supplier's USD price

Only the named material is priced; other shopping-list items, tax, delivery, hardware, and labor are excluded.

No signup. Your measurements stay in your browser.

Your material estimate

Fence pickets to order

213pickets

Includes 10% overage and purchase-unit rounding where applicable.

Fence bays
12 bays
Fence posts
14 posts
Rails with overage
40 rails
Picket-covered length
96 ft

Example estimate: default sample values are shown. Update the measurements and select Calculate before using or copying this list.

Take this to your supplier

Shopping list

  • Fence postsIncludes one extra post boundary for each entered gate; no post waste is added.14 posts
  • Fence rails3 rails per non-gate bay plus 10% overage.40 rails
  • Fence picketsCovers the non-gate run with the entered gap plus 10% overage.213 pickets
  • Post-setting concrete2 user-entered bag(s) per estimated post; no bag size or hole geometry is inferred.28 bags
Calculation assumptions
  • The fence is one continuous straight run; each gate adds one post beyond the continuous run count.
  • Post spacing is treated as a maximum, so every partial bay creates a full additional bay.
  • Pickets cover only total fence length minus entered gate width.
  • Concrete bags are a user-entered planning multiplier; calculate hole volume and use the selected product's stated yield for a project-specific bag count.
  • Post depth, footing volume, bracing, wind load, terrain changes, corners, and gate hardware require project-specific verification.

Fence layout

How fence materials are estimated

1

Non-gate run

Subtract combined gate width from total fence length.

2

Bays and posts

Divide by maximum post spacing and add gate post boundaries.

3

Rails and pickets

Apply rails per bay, picket face width and gap, then add waste.

Measurement guidance

Corners, slopes, and loads need a layout

Measure the fence centerline and record the combined clear width of all gates separately. Calculate distinct straight runs separately when corners, slopes, or spacing rules change.

The concrete input is only a user-entered bags-per-post planning multiplier. It does not assume a bag size, hole diameter, depth, post displacement, or product yield. Use the Post Hole Concrete Calculator for a volume-based concrete bag estimate.

The regular straight-run model excludes corners, elevation changes, braces, gate hardware, wind loading, post depth, footing volume, utilities, easements, and local height or setback rules.