Decks & carpentry

Deck material calculator

Estimate a rectangular deck framing layout: joists, side rim or ledger lumber, beam length, support posts, and footing count.

Deck framing

Estimate deck framing materials

Measurement system

Joists span the deck width; beams run along the deck length.

Overage

Covers spillage, uneven depth, settling, and minor measurement differences.

No signup. Your measurements stay in your browser.

Your material estimate

Joists to plan for

15joists

Includes 10% overage and purchase-unit rounding where applicable.

Deck area
192 sq ft
Beam rows
2 rows
Support posts
6 posts

Take this to your supplier

Shopping list

  • Joists spanning the deck widthLayout count plus 10% lumber allowance.15 pieces
  • Side rim / ledger framingTwo deck-length sides; convert to available stock lengths.36 linear ft
  • Beam material2 beam rows plus 10% lumber allowance.36 linear ft
  • Support posts3 posts per beam row at the entered maximum spacing.6 posts
  • Post footingsOne footing per estimated support post; size and concrete are not inferred.6 footings
Calculation assumptions
  • Joists span the entered deck width and are spaced along the deck length, including both end joist lines.
  • Beams run parallel to deck length; post spacing is a maximum planning interval along each beam.
  • The 10% allowance applies to joist pieces and linear rim/beam lumber, not structural post count.
  • Member sizes, spans, connections, footings, guards, loads, and permits require local code and structural verification.

Framing layout

How deck framing material is estimated

1

Joist lines

Divide deck length by maximum joist spacing and include both ends.

2

Beams and posts

Multiply beam rows by deck length, then place posts at the entered maximum interval.

3

Lumber allowance

Add waste to joist pieces and linear beam/rim material before purchase rounding.

Structural boundary

A quantity layout is not a deck design

Joist and beam size, allowable span, species, grade, connections, ledger attachment, lateral load, footings, guards, and permits must follow local code and a suitable design.