Round hole volume
π × radius² × depth for each cylindrical hole.
Hardscape & masonry
Calculate concrete volume and whole dry-mix bags for round post holes after subtracting the embedded post volume.
Your material estimate
16bags
Includes 10% overage and purchase-unit rounding where applicable.
Take this to your supplier
Volume-to-bag math
π × radius² × depth for each cylindrical hole.
Remove rectangular post cross-section × embedded depth.
Multiply by hole count, add overage, divide by nominal bag yield, and round up.
Site requirements
Post size alone does not determine footing dimensions. Frost depth, soil, wind, uplift, structure loads, drainage, and local code can change the required hole.
Dry-mix yields vary by product and mixing practice. Use the yield printed on the selected product when ordering.