Stud members
Count spacing positions, replace boundary positions with entered end studs, then add openings × additional studs.
Decks & carpentry
Estimate studs and whole top- and bottom-plate stock boards from a framing layout you define, including explicit opening additions, waste, and optional prices.
Your material estimate
19studs
Includes 10% overage and purchase-unit rounding where applicable.
Example estimate: default sample values are shown. Update the measurements and select Calculate before using or copying this list.
Take this to your supplier
User-specified assembly
Count spacing positions, replace boundary positions with entered end studs, then add openings × additional studs.
wall length × sections × entered plate runs for top and bottom groups.
Apply waste, divide plate groups by entered stock length, and round each group upward.
Worked example
At 16 in spacing with two end studs and four user-specified opening studs, the base is 17 studs and the 10% order is 19 studs. Two top runs and one bottom run using 8 ft stock require five top plate boards and three bottom plate boards. These unlike products remain separate instead of being combined into one piece count.
Design boundary
RightQty does not size headers, beams, studs, plates, connections, or fasteners and does not determine loads, bracing, fire blocking, required spacing, or code compliance. A qualified professional and local requirements control the design.